What good defect management looks like
On a well-run job, anyone can answer four questions about any defect in seconds:
- Where is it? The building, level, zone and room.
- Whose is it? The trade, and the subcontractor holding that package.
- What does it look like? A photo taken when it was found, and another when it was fixed.
- Where is it up to? Open, fixed and waiting to be checked, or accepted and closed.
The last step matters most. A defect isn't closed because the trade says so. It's closed when the head contractor has looked at the fix and accepted it.
Why defect lists fall short
Most defects still live in a spreadsheet, a PDF walk report or a punch-list app that sits apart from the programme. That causes the same problems on every job:
- The list can't tell you which floor is held up by defects, or which trade has the most outstanding.
- Photos sit on someone's phone and never make it to the subcontractor who has to fix the work.
- Trades get a long list each week and have to work out which items are theirs.
- “Fixed” and “checked” get blurred, so items close without anyone looking, and come back at handover.
The fix is to stop treating defects as a separate list. A defect belongs to a piece of work in a location, the same place progress is tracked. Then the matrix that shows how far along each floor is also shows where defects are holding it up.
Run inspections as hold points
The cleanest way to catch defects is to make inspection a step every piece of work passes through. When a trade finishes an area, they ask for inspection. The head contractor walks it and either passes it or fails it with a list of defects.
Failing an inspection hands the work back to the trade. They fix each defect and mark it fixed, then ask for re-inspection. When the re-inspection passes, the fixes are accepted and the work is signed off. Every step is recorded with a name and a time.
Defects also turn up outside inspections: damage from a following trade, or something found during a walk. Raising one on work that has started or finished reopens it, so it can't quietly stay marked complete.
How Infrasis handles it
The trade asks for inspection
From a phone on site, when the area is finished. The head contractor sees it waiting on the matrix and in the site view.
Inspect and fail with defects, or pass
Add each defect with what's wrong, the room and a photo. Infrasis can draft the defect from the photo for you to check before raising it.
The subcontractor fixes and marks fixed
They see only their own package's defects, each with its photos and location, and mark each one fixed as they go.
Re-inspect and sign off
Passing the re-inspection accepts the fixes and completes the work. The defect register keeps the full history.
Questions
Can subcontractors see other trades' defects?
No. A subcontractor sees the defects on its own package's work. The head contractor sees every defect on the job.
Can I raise a defect without an inspection?
Yes. Anyone on the project can raise a defect against a piece of work. If that work has started or finished, it goes back to the trade until the defect is fixed.
Does the AI close defects?
No. Infrasis can draft a defect's title and room from a site photo, but a person raises it, the trade marks it fixed, and only the head contractor accepts the fix.
Where do the photos go?
They are attached to the work and the defect they relate to, with who took them and when, so they turn up wherever that work is opened.
Building in NSW? Our guide for Australian builders covers how defect records fit alongside the state's apartment building reforms.